Procedure:
Ensure that
all the connection of the instrument is proper.
Turn the
viscometer ON.
Take out
the viscosity standard solution in 500ml beaker, adjust the temperature to 25°
C. Attach the
required spindle, adjust required speed & measure the viscosity, not e down the constant reading.
required spindle, adjust required speed & measure the viscosity, not e down the constant reading.
Viscosity
standards, speeds, spindles required & tolerance limits are as follows:
Sr. No
|
Viscosity of
standard in cps
|
Actual viscosity
of standard in cps
|
Spindle No.
|
Entry Code
|
RPM
|
Tolerance (in
cps)
|
|
Minimum
|
Maximum
|
||||||
1.
|
5.00
|
4.70
|
ULA
|
00
|
60
|
4.55
|
4.85
|
2.
|
50.00
|
48.40
|
LV1
|
61
|
60
|
46.9
|
4909
|
3.
|
5000.00
|
4820.00
|
LV3
|
63
|
10
|
4651.83
|
4988.17
|
Acceptance
criteria
Viscosity
should be within the tolerance limits.
Do not
transfer the viscosity solution to the original container back after use.
Precautions
Take due
care to avoid any contamination of the standard solutions.
Avoid air
bubble entrapment during transfer of standard solutions.
Frequency
Once in 6
months.
Maintenance
/ Repairs:
When the
instrument do not comply with the requirement/ tolerance range specified above,
the instrument should be labeled “OUT OF CALIBRATION” and should be repaired /
served.
QUALITY ASSURANCE DEPARTMENT
CALIBRATION REPORT OF BROOKFIELD VISCOMETER
Reference- Date
–
Frequency – Once in 6 months Instrument
No-
Make – Brookfield Engineering
Laboratories, Inc. Model
– LVDV – II + Pro
Take out
the viscosity standard solution in 500ml beaker, adjust the temperature to 25°C
& attach the required spindle, adjust required speed & measure the
viscosity, note down the constant reading.
Sr. No
|
Viscosity of
standard in cps
|
Actual viscosity
of standard in cps
|
Observed
Viscosity CPS
|
Tolerance (in
cps)
|
Remarks
(S / NS)
|
||
Minimum
|
Maximum
|
||||||
1.
|
5.00
|
4.70
|
4.55
|
4.85
|
|||
2.
|
50.00
|
48.40
|
46.9
|
4909
|
|||
3.
|
5000.00
|
4820.00
|
4651.83
|
4988.17
|
|||
Conclusion: Calibration is satisfactory (S) /
not satisfactory (NS)
|
|||||||
Next
Calibration Due On:
|
|||||||
Done By:
Date:
|
Checked By:
Date:
|
||||||
No comments:
Post a Comment